Short answer: Inspect a deck from the bottom up: footings and posts, beams, joists and hangers, then the ledger and its flashing, the lateral connection, and only then the surface, guards and stairs. The common reference is the American Wood Council's DCA 6 guide, whose current edition is based on the 2015 IRC, so treat it as a benchmark rather than the code your jurisdiction adopted. Most serious failures start at the ledger or the guards, and your report should say plainly what you could not see.
Decks look simple, which is why so many are built badly and why so many inspectors give them a quick walk and a photo. A deck is a structure hanging off the side of a house, often over a patio where people stand. It deserves the same method as the rest of the inspection.
This guide covers what to check, what to call out, which references to use and where your inspection stops.
Why decks deserve their own method
InterNACHI's deck inspection material makes the case bluntly. It estimates that of 45 million existing decks, only 40% are completely safe, and states that about 90% of deck collapses resulted from the ledger separating from the house. It also notes that rail failures happen far more often than total collapses, and cause more injuries. The North American Deck and Railing Association (NADRA) said in a June 2017 press release that the US has roughly 40 million residential decks, and estimated that half are more than 25 years old.
Those are association estimates, not government data, and they do not agree exactly. The direction is the same: many decks are old, and the ledger and the guards are where people get hurt.
DCA 6: the common reference, with a caveat
Most inspectors and many building departments use the American Wood Council's Prescriptive Residential Wood Deck Construction Guide, known as DCA 6. The edition AWC currently offers is "Based on the 2015 International Residential Code," copyright 2018. We did not find an edition for a later IRC on AWC's site as of September 2026.
What that means for you:
- It is a construction guide, not an inspection standard. It describes how to build a prescriptive deck. You use it as a benchmark for what good construction looks like.
- Your jurisdiction may use a different code edition. DCA 6 itself says that where it differs from the IRC, "provisions of the IRC shall apply," and that all construction must be approved by the authority having jurisdiction.
- It has a limited scope. It applies to "single level residential wood decks that are attached to the house to resist lateral forces." It assumes deck length no greater than width and 6x6 minimum posts, excludes hot tubs and other large concentrated loads, and does not cover snow loads over 40 psf.
So you cite DCA 6 as a reference that explains why a condition matters, not as a code ruling. As with any home inspection, you are not the code official. Our guide to what home inspectors are not allowed to do covers the wider boundary.
Inspect from the bottom up
InterNACHI's guidance is to follow the order of construction: start underneath, and if the deck looks unsafe from below, do not walk out on it. Stop and report. It is a simple rule, and it keeps you off decks that should not carry you.
A working sequence:
- Footings and posts.
- Beams and post-to-beam connections.
- Joists, hangers and blocking.
- Ledger, fasteners and flashing.
- Lateral connection to the house.
- Decking.
- Guards and guard posts.
- Stairs, handrails, stair footings and lighting.
NADRA's free Deck Evaluation Guide for deck professionals follows a similar list: stairs, footings and supports, posts and columns, beams, joists, ledger boards, deck surfaces, handrail assemblies, guards and additional features.
Footings, posts and beams
DCA 6 wants footings on undisturbed soil at least 12 inches below the undisturbed ground surface or below the frost line, whichever is deeper. It also says footings closer than 5 feet to an exterior house foundation wall must bear at the same elevation as the house footing, and that footings should not sit over septic systems, utility lines or enclosed meters.
You usually cannot see footing depth. You can see:
- Posts sitting on the ground, on blocks, or on pads that have moved.
- Posts not centered on footings.
- Rot at the base of posts, and uncoated cut ends.
- Post anchors that are not galvanized or stainless.
- Beams fastened to the side of the post with no notch or post cap. DCA 6 prohibits attaching the beam to the side of the post without notching; it calls for a notch or an approved post cap.
- Missing diagonal bracing at tall corner posts. DCA 6 calls for bracing parallel to the beam at each corner post greater than 2 feet tall.
- Beam sag. Sighting along the bottom edge is often easier than using a level.
Joists, hangers and blocking
- Hangers. DCA 6 requires joist hangers at least 60% of the ledger or beam depth, from an approved manufacturer, corrosion resistant. Look for missing fasteners, wrong fastener types, and clip angles used in place of hangers, which DCA 6 does not allow for joists.
- Joists framing into both sides of one beam. DCA 6 does not allow joists from opposite sides of the same beam.
- Overhangs and cantilevers. Long joist overhangs past the beam, or beams overhanging posts, are worth noting where they look excessive.
- Decay. Probe where water sits: tops of joists under decking, joist ends at the rim, and anywhere near the ledger.
Ledger attachment
This is the connection that fails. Spend time here.
| Check | What DCA 6 describes | What a defect looks like |
|---|---|---|
| Ledger size | Minimum nominal 2x8, pressure-treated, at least as deep as the joists and no deeper than the house band joist | Undersized or untreated ledger |
| Fasteners | 1/2 inch lag screws or through-bolts with washers, staggered top to bottom; spacing per its Table 5 | Nails only, a single row, missing washers, too few fasteners for the joist length |
| What it attaches to | The house band or rim joist, or concrete or solid masonry with approved anchors | Attached to brick, stone or other veneer, hollow masonry, a cantilevered floor overhang or a bay window, all prohibited |
| Band joist | Must be able to carry the deck; thin I-joist bands under 1 inch and truss "ribbon" boards are not intended to support a ledger without other details | Ledger on a band that cannot carry it |
| Siding | House siding or exterior finish removed before installing the ledger | Ledger fastened over siding |
| Gap | Maximum 1/2 inch between the ledger face and the face of the wall sheathing, and 1 inch between the ledger face and the band joist. Stacked washers are allowed with wood structural panel sheathing, not with gypsum or foam sheathing | A gap wider than those limits, stacked washers over gypsum or foam sheathing |
| Flashing | Corrosion-resistant flashing required where a ledger meets a wood-framed wall; threshold flashed and caulked | No flashing, caulk only on a wood wall, aluminum flashing against treated lumber, water staining on the band joist below |
From outside you cannot confirm lag screw length or whether the tip passes the band joist. Say so. If you can see the band joist from a basement or crawlspace, look for fastener tips, water staining and decay, and report what you see.
InterNACHI offers a rule-of-thumb formula for ledger fastener spacing. It is a screening aid, not a design check, and a deck with far fewer fasteners than the spacing tables suggest deserves a recommendation for evaluation by a qualified deck contractor or engineer.
Lateral load connection
DCA 6 requires decks to be "positively anchored to the primary structure." Its prescriptive method uses hold-down tension devices in at least two locations within 2 feet of the edges of the deck, each with an allowable stress design capacity of not less than 1,500 lb. The wall must be sheathed with at least 3/8 inch wood structural panel sheathing, and the method is not for brick veneer.
In the field, look for the devices from below or from the basement or crawlspace. On older decks they are usually absent. Report their absence as an observation with its consequence, not as a code violation: the deck relies only on the ledger fasteners to resist being pulled away from the house.
Guards and stairs
Rail failures injure more people than full collapses, so give guards a push test and a close look.
| Component | What DCA 6 describes | Common defects |
|---|---|---|
| Guard required | Decks more than 30 inches above grade need a guard | No guard, or a guard that stops short |
| Guard openings | Openings must not allow a 4 inch sphere to pass, including under benches used in place of guards | Wide baluster gaps, horizontal rails a child can climb |
| Guard posts | Minimum 4x4, attached to joists or rim joists of at least 2x8; hold-downs with at least 1,800 lb capacity for a 36 inch maximum guard height | Posts notched and lagged only, posts that move under hand pressure |
| Stringers | Minimum 2x12; at least three cut stringers if only cut stringers are used; spans limited | Two stringers on a wide stair, cracked cut stringers |
| Stair width and landings | Minimum 36 inch width; landings at least as wide as the stair; intermediate landing if total rise exceeds 12 feet | Narrow stairs, missing landing |
| Handrail | Stairs with 4 or more risers need a handrail on at least one side, 34 to 38 inches high, graspable and continuous | No handrail, a 2x6 flat rail that cannot be grasped, broken returns |
| Stair footings | Stringers bear on posts founded at least 12 inches deep or below frost; not on pads that are not founded that deep | Stringers resting on soil or a patio slab |
| Stair lighting | A light at the top landing that lights all stairs and landings, switched from inside or on motion or timer | No light, light switched only from outside |
Check treads for rot and deflection, and riser height and tread depth for consistency. Report uneven risers as a trip hazard.
Fasteners, connectors and corrosion
Treated lumber is corrosive to the wrong metal. DCA 6 requires:
- Screws, bolts, washers, nuts and nails in treated wood to be hot-dipped galvanized, stainless steel, silicon bronze or copper. Fasteners other than nails may also be mechanically zinc-coated to ASTM B 695, Class 55 minimum.
- Connectors such as hangers and post anchors to be galvanized or stainless.
- Stainless steel grade 304 or 316 for fasteners and connectors exposed to salt water or within 300 feet of a saltwater shoreline.
- Fasteners and connectors of the same corrosion-resistant material.
- Flashing that is corrosion-resistant metal at least 0.019 inch thick or approved non-metallic material, with no aluminum in direct contact with copper-treated lumber.
In the field, look for rust staining, heads that have lost section, flaking coatings on hangers, electro-plated screws in treated lumber, and mixed metals. Near the coast, corrosion is often the headline finding.
Typical failure points, in one list
| Failure point | Why it fails | What to report |
|---|---|---|
| Ledger to house | Too few fasteners, nails only, attached to veneer or a thin band, rot behind missing flashing | Condition observed, fastener pattern seen, flashing absent, recommend evaluation |
| Guards | Posts notched and lagged, no hold-downs, decay at the base | Movement under hand pressure, attachment observed |
| Posts and footings | Posts on grade, undersized posts, no post cap or notch | Bearing observed, rot, missing connection |
| Hangers and connectors | Corrosion, missing nails, wrong fasteners | Specific hanger locations and photos |
| Stairs | Stringers on soil, too few stringers, no handrail | Each defect with location |
| Decking and joists | Rot where water collects | Areas probed and results |
Writing deck findings
Deck findings get read by the client, the agent and a deck contractor pricing the repair. Write them so each reader gets what they need.
- Name the component and location. "Ledger at the east wall, between the second and third joists from the north end."
- Describe what you saw. "Ledger fastened with nails only; no lag screws or bolts observed; no flashing observed above the ledger."
- Say why it matters. "The ledger connection supports the deck at the house. Inadequate fastening can allow the deck to pull away from the house."
- Recommend. "Evaluation and correction by a qualified deck contractor or engineer."
- Photo attached to the finding.
Mark safety items clearly and put them near the top. More on wording is in how to write defect comments that hold up.
In Binsr, you can build a deck section, or a standalone deck template, in the order above, with findings, severity levels and photos that attach to the individual finding. If you sell deck evaluations as a separate service, one inspection can carry the main report and a separate deck report, each with its own template.
Limitations to state
Your deck inspection is visual. State the limits in the report and the agreement:
- You did not determine code compliance or the code edition that applies.
- You did not verify footing depth, fastener length or penetration, or the capacity of the band joist behind the ledger.
- You did not remove decking, skirting or finishes, or perform load testing.
- Areas you could not reach (low clearance, enclosed undersides, snow cover) are listed as not inspected.
- If you did not walk onto the deck because it looked unsafe from below, say so and why.
In Texas, as of November 2026, decks are reported under section I.K, "Porches, Balconies, Decks, and Carports," of the TREC REI 7-6 form. TREC's November 9, 2026 meeting agenda included proposing amendments to the inspection standards and the report form, so check the current form if TREC adopts a revision. See our TREC report guide.
Pricing deck inspections
Inside a standard home inspection, the deck is part of the job, and your base fee should reflect the time it takes to do it properly. As a standalone service, such as a deck evaluation for an owner or a new construction deck check, price it from your own time on site, drive time, report time and liability. The method is in how to price ancillary inspection services. On new builds, the deck ledger flashing is worth photographing at the pre-drywall inspection, and the finished deck is worth a close look at the 11-month warranty inspection.
Frequently asked questions
Sources and verification
- Prescriptive Residential Wood Deck Construction Guide, DCA 6 (2015 IRC), American Wood Council
- Property Inspection Report Form REI 7-6, Texas Real Estate Commission
- Deck Evaluation Guide, North American Deck and Railing Association
- NADRA provides deck safety resources for consumers and pros, North American Deck and Railing Association
- Inspecting a deck, InterNACHI
Keep reading
- New construction home inspections
- Pre-drywall inspection checklist and pricing
- 11-month builder warranty inspections
- How to price ancillary inspection services
- Write defect comments that hold up
- Home inspector tools
Try Binsr on five real inspections. No time limit, no credit card. See pricing or start your trial.